Ashland, Grafton County
Energy Audit Measure Implementation
Funding recipient: Ashland
What the funding paid for
The proposed project includes implementation of two energy efficiency recommendations included in the Energy Evaluation performed by Process Energy Services, LLC (January 2018). Energy Conservation Measure (ECM) #1 includes taking two of the wastewater treatment facility's existing four lagoons off-line and replacing the existing 74 diffusers in primary lagoon #1. ECM #3 includes replacing the existing hot water heater servicing the lab and bathroom sinks with an on-demand electric water heater. The energy efficiency measures to be implemented by this project are expected to reduce energy consumption by approximately 50%, resulting in savings of over 200,000 KWh per year. Additionally, the reduction of the wastewater treatment facility's energy consumption will benefit the environment by providing a reduction in greenhouse gas emissions including C02, N20 and CH4.
Funding
$100,000
- Clean Water State Revolving Fund: $100,000
- Commitment date: Aug. 18, 2021
- Project type: Sustainability
- Water system: Wastewater
- Project number: 064-08
- Location: Approximate
- Record source: EPA public records