Prototype by Consul, Inc. for NHDES RFP DES 2026-23. Not an official NHDES website.
Conway, Carroll County
Saco River Erosion Mitigation for Protection of the WWTF
Funding recipient: North Conway Water Precinct
What the funding paid for
The project involves further evaluation of alternatives that were developed in the Phase 1 study including the selected feasible alternatives, public education and outreach, selection of a preferred alternative, final design and engineering of the preferred alternative, and preparation of required permit applications and bid documents. The goal of the project is to prevent the Saco River from further eroding the banks which are causing bank instability and posing a risk to the WWTF.
Funding
$390,963
- Clean Water State Revolving Fund: $390,963
- Commitment date: April 12, 2023
- Project type: Planning
- Water system: Wastewater
- Project number: 066-09
- Location: Approximate
- Record source: EPA public records
All New Hampshire projects · User guide · Presentation · The multistate Water Funding Explorer