New Durham, Strafford County
New Well House and Distribution Upgrades Project
Funding recipient: Copple Crown Village District
What the funding paid for
The design and construction of an addition at the upper pressure zone/Station 2 building to accommodate new atmospheric and pressure tanks, treatment system, backwash discharge, booster pumps with new electrical and mechanical piping; connection of the existing waterline and electrical line from the well to the building; construction of a new access road; installation of new pressure reducing valve structures and water main distribution upgrades throughout the system, as needed. Funds will also be used for design, bidding and construction of new pressure tanks and booster pumps at Stations 1 and 3.
Funding
$265,200
- Drinking Water State Revolving Fund: $265,200
- Commitment date: June 29, 2022
- Project type: Infrastructure (Construction)
- Water system: Drinking Water
- Project number: 1672020-01
- Location: Approximate
- Record source: EPA public records