Colorado
Where the state’s revolving fund money for water went, project by project.
$729 million committed to 204 drinking water and clean water projects.
- Drinking water: $454 million
- Clean water: $275 million
- Grants and forgiven principal: $177 million
- Latest agreement: June 20, 2025
The 25 largest projects
- Denver Water Lead Service Line Replacement: Denver Water, Denver. $76.1 million, drinking water, $40.0 million in grants and forgiven principal. Dec. 15, 2022. This project consists of replacement of lead service lines throughout Denver Water's service area.
- Wellington, Town of: Wellington, Town of. $42.7 million, clean water. May 5, 2022. This project includes the expansion of the WWTP. Facilities to be added include new buildings (Headworks, UV Disinfection, RAS/WAS, Administration), new secondary clarifiers, new aeration facilities, and expansions to…
- Pagosa Area Water and Sanitation District: Pagosa Area Water and Sanitation District, Pagosa Springs. $38.4 million, drinking water, $5.0 million in grants and forgiven principal. Feb. 14, 2023. This project incudes the construction of a surface water treatment plant.
- Sterling Wastewater System Improvements: Sterling, City of. $33.5 million, clean water. Nov. 18, 2020. Project includes expansion and improvements of the existing wastewater treatment facility including improvements to the headworks facilities, influent pump station, influent forcemain and new dual forcemain,…
- South Adams County Water and Sanitation District: South Adams County Water and Sanitation District, Commerce City. $30.0 million, drinking water, $30.0 million in grants and forgiven principal. May 23, 2024. The District will be constructing a new water treatment plant. This new treatment plant will utilize ion exchange for the removal of Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA).
- Englewood, City of: Englewood, City of, Englewood. $22.6 million, drinking water. May 23, 2024. The project consists of identifying and replacing lead service lines (LSLs), to include both the public and private portions of the identified lead service lines, in accordance with Bipartisan Infrastructure Law…
- Fort Lupton, City of: Fort Lupton, City of. $22.5 million, clean water, $1.5 million in grants and forgiven principal. Dec. 5, 2022. The tap fee for connecting to the Metro Wastewater Northern Treatment plant is estimated to significantly increase in 2023. The tap fee is part of a larger project to address and meet the Compliance Schedule to attain…
- Greeley, City of: Greeley, City of, Greeley. $20.9 million, drinking water, $10.0 million in grants and forgiven principal. Dec. 18, 2024. This project involves identifying and removing lead service lines throughout the City?s service area.
- Englewood, City of: Englewood, City of, Englewood. $17.6 million, drinking water, $10.0 million in grants and forgiven principal. May 23, 2024. The project consists of identifying and replacing lead service lines (LSLs), to include both the public and private portions of the identified lead service lines, in accordance with Bipartisan Infrastructure Law…
- Upper Thompson Sanitation District: Upper Thompson Sanitation District. $17.5 million, clean water. May 23, 2024. This project consists of constructing a new water reclamation facility, two lift stations, and a force main.
- Ouray, City of: Ouray, City of. $17.3 million, clean water. May 5, 2022. The project consists of constructing a new wastewater treatment facility.
- South Adams County Water and Sanitation District: South Adams County Water and Sanitation District, Commerce City. $16.2 million, drinking water. May 23, 2024. The District will be constructing a new water treatment plant. This new treatment plant will utilize ion exchange for the removal of Perfluorooctane Sulfonate (PFOS) and Perfluorooctanoic Acid (PFOA).
- Grandby, Town of: Granby, Town of, Granby. $15.1 million, drinking water. June 12, 2025. The project involves constructing a new conventional surface water treatment plant to replace the existing North Service Area plant, along with upgrades to the adjacent intake pump station.
- Project 7 Water Authority: Project 7 Water Authority, Montrose. $14.4 million, drinking water. Nov. 22, 2024. The Project consists of constructing an intake structure and raw water transmission line downstream of the Ridgway Reservoir, a new water treatment facility and a treated water transmission line serving the communities…
- La Plata/San Juan Subdistrict of the Purgatory Metropolitan District: La Plata/San Juan Subdistrict of the Purgatory Metropolitan District. $13.1 million, clean water. May 5, 2022. The project consists of constructing a new mechanical wastewater treatment facility at the district's new WWTF location.
- Fort Lupton, City of: Fort Lupton, City of, Fort Lupton. $12.9 million, drinking water. June 12, 2025. The project involves installing a 1 million-gallon elevated storage tank, a new pump station, and related pipelines.
- Silt, Town of: Silt, Town of, Silt. $12.8 million, drinking water, $8.6 million in grants and forgiven principal. Dec. 12, 2023. This project includes treatment for Manganese.
- Silt, Town of: Silt, Town of, Silt. $12.7 million, drinking water. Dec. 12, 2023. This project consists of treatment plant upgrades.
- Ouray, City of: Ouray, City of, Ouray. $12.1 million, drinking water, $5.0 million in grants and forgiven principal. Dec. 14, 2022. This project includes the construction of a new membrane surface water treatment plant.
- Leadville Sanitation District: Leadville Sanitation District. $12.0 million, clean water. May 23, 2024. The project consists of improvements to the wastewater facility, including upgrades and repairs to the headworks, aeration basins, clarifiers, solids handling, disinfection, and addition of a septage receiving station.
- Boulder, City of: Boulder, City of. $11.8 million, clean water. Dec. 12, 2023. This project includes modifications to the aeration system to improve nutrient removal, replacing aeration blowers, construction of a hydrocyclone facility, converting the existing pre-dewatering storage tank into a…
- Kremmling, Town of: Kremmling, Town of, Kremmling. $11.0 million, drinking water. Nov. 22, 2024. The project consists of improvements and expansion of the water treatment facility. This will include a new building, clearwell, ultra-filtration system, backwash system, chemical feeds, and a new storage tank
- Crested Butte, Town of: Crested Butte, Town of. $11.0 million, clean water, $1.5 million in grants and forgiven principal. Dec. 9, 2022. This project consists of upgrades to the wastewater treatment facility including an aeration process building and upgrades to the solids processing equipment.
- Evans East Side Stormwater Improvements: Evans, City of. $8.4 million, clean water. Nov. 18, 2020. The proposed project consists of two major stormwater construction projects designed to mitigate severe localized flooding. The work will include new storm sewer conveyance infrastructures and outfall structures; and…
- Lochbuie, Town of: Lochbuie, Town of, Lochbuie. $6.1 million, drinking water. May 23, 2024. The Town will be constructing a new elevated water storage tank. Proposed improvements include a 2 MG composite elevated potable water storage tank with associated piping, valving, and appurtenances which include a…
Counties that received the most
- Denver: $96.8 million
- Weld: $84.3 million
- Adams: $51.8 million
- Larimer: $48.1 million
- Arapahoe: $42.4 million
- Logan: $40.6 million
- Archuleta: $38.4 million
- Grand: $38.0 million
- Ouray: $30.1 million
- Garfield: $25.8 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.