Massachusetts
Where the state’s revolving fund money for water went, project by project.
$3.1 billion committed to 450 drinking water and clean water projects.
- Drinking water: $1.1 billion
- Clean water: $2.0 billion
- Grants and forgiven principal: $233 million
- Latest agreement: June 1, 2025
The 25 largest projects
- WWTF Initial Capital Improvements: Lynn Water and Sewer Commission. $74.0 million, clean water, $5.6 million in grants and forgiven principal. April 1, 2022. The Lynn Water and Sewer Commission?s project includes modifications and additions to the existing WWTF and collection system pump stations. These improvements are necessary to remain in compliance with effluent…
- Wastewater Treatment Facility Upgrades Project: Town of Fairhaven. $65.2 million, clean water, $10.8 million in grants and forgiven principal. Dec. 1, 2023. The Town of Fairhaven seeks essential upgrades to the WWTF to address stringent total nitrogen permit limits by 10/1/2026 and replace aging/obsolete infrastructure. Meeting the TN limit requires the upgrade of existing…
- Replacement of Water Treatment Plant ? Phase 2B: Springfield Water & Sewer Commission, Springfield. $65.0 million, drinking water. Nov. 1, 2024. The Project consists of the construction of a water treatment palnt with new treatment processes including coagulation, flocculation, Dissolved Air Flotation (DAF) and filtration to replace the existing direct…
- Downtown Area Collection System and WWTF: Town of Orleans. $52.3 million, clean water. Aug. 1, 2020. The construction Project includes a new collection system, PS, WWTF and effluent disposal for the Downtown Area consisting of about 1,087 users to address water quality in the various estuaries. In general, the project…
- Phase 1 - WRRF and Collection System: Town of Dennis. $50.0 million, clean water. March 1, 2025. The project includes implementation of Phase 1 of Dennis's CWMP and includes construction of a Water Resource Recovery Facility and a recharge facility, construction of a sewer "spine" from the WRRF to the commercial…
- DITP Clarifier #2: Massachusetts Water Resources Authority. $50.0 million, clean water. Dec. 1, 2024. The Massachusetts Water Resources Authority?s project is needed to correct deficiencies noted during the first Primary & Secondary Clarifier project. Project will include the replacement of systems such as: influent…
- West Lynn Sewer Separation: Lynn Water and Sewer Commission. $49.1 million, clean water, $755,000 in grants and forgiven principal. July 1, 2021. The Lynn Water and Sewer Commission has entered into a Third Modified Consent Decree with the United States Environmental Protection Agency to implement a long-term control plan to reduce combined sewer overflow…
- Phase I - WRRF and Collection System: Town of Yarmouth. $46.4 million, clean water, $6.3 million in grants and forgiven principal. Feb. 1, 2024. The Project implements Phase 1 of Yarmouth's CWMP that includes: construction of Water Resource Recovery Facility, construction of effluent recharge site and collection system with sewering (approximately 78,000 lin…
- Phase I - WRRF and Collection System: Town of Yarmouth. $45.8 million, clean water. Dec. 1, 2024. The Project implements Phase 1 of Yarmouth's CWMP that includes: construction of Water Resource Recovery Facility, construction of effluent recharge site and collection system with sewering (approximately 78,000 lin…
- Wastewater Treatment Facility Upgrade - Phase 2: City of Taunton. $42.8 million, clean water. Aug. 1, 2022. The City of Taunton?s Phase 2 of the WWTF Upgrade project consists of a complete upgrade of the Taunton Wastewater Treatment Facility (WWTF). Improvements to the WWTF are required to meet the requirements of the new…
- South Boston Sewer Separation: Boston Water and Sewer Commission. $41.4 million, clean water. May 1, 2023. The Boston Water and Sewer Commission seeks to reduce CSO discharges in Boston Harbor and its tributaries. The plan involves five sewer separation projects over an area of 403 acres by constructing new storm drains and…
- Wastewater Treatment Facility Improvements: City of Fall River. $39.1 million, clean water. Aug. 1, 2021. The City of Fall River?s Wastewater Treatment Facility (WWTF) Improvements project is the second phase of a complete WWTF rehabilitation/upgrade for reliable NPDES compliance and to address water quality and public…
- Harwich Phase 3 Sewer Extension: Town of Harwich. $37.7 million, clean water, $2.0 million in grants and forgiven principal. July 1, 2024. The Harwich 2023 Phase 3 Sewer Project will allow the town to continue implementing their approved Comprehensive Wastewater Management Plan (CWMP). This project will continue the sewer implementation called for in the…
- DITP Clarifier #2: Massachusetts Water Resources Authority. $37.0 million, clean water. Nov. 1, 2022. The Massachusetts Water Resources Authority?s project is needed to correct deficiencies noted during the first Primary & Secondary Clarifier project. Project will include the replacement of systems such as: influent…
- WWTF Upgrades Project: Town of Spencer. $36.9 million, clean water. Sept. 1, 2022. The Town of Spencer?s project involves essential upgrades to the WWTF to address stringent phosphorus and copper limits, achieve nitrogen removal goals, and replace aging infrastructure. An Administrative Order and the…
- Mashpee WRRF and Collection System - Phase 1: Town of Mashpee. $33.4 million, clean water. Oct. 1, 2022. The Town of Mashpee proposes the construction of the new Phase 1 Mashpee Water Resource Recovery Facility (WRRF) and collection system to address nitrogen impacts to the Mashpee River watershed. The facility will…
- Wastewater Treatment Facility Upgrades ? Phase I: Town of Bridgewater. $30.3 million, clean water. Aug. 1, 2022. The Town of Bridgewater?s WWTF Phase I Upgrades project will implement improvements and new processes for advanced nutrient removal for Total Nitrogen, and modernize existing treatment systems to meet the more…
- Remote Headworks Upgrade: Massachusetts Water Resources Authority. $30.0 million, clean water. Jan. 1, 2021. MWRA has three remote headworks - Chelsea Creek, Columbus Park, and Ward Street - which were built and placed into operation in the 1960's. All wastewater flows from the MWRA Northern Service Area are collected at the…
- Wastewater Treatment Facility Upgrade - Phase 1: City of Taunton. $30.0 million, clean water, $3.0 million in grants and forgiven principal. Oct. 1, 2021. This project is part of a complete upgrade of the Taunton Wastewater Treatment Facility (WWTF) that are necessary to meet the requirements of the new NPDES discharge permit. The facility will expand hydraulically to…
- BSI Rehab & Replacement with New BS Pump Station: Town of Franklin. $29.7 million, clean water. June 1, 2023. The Town of Franklin seeks to rehabilitate, relocate, and replace the 100-year-old Beaver Street Interceptor. This project includes upsizing 900 LF of sewer, cured-in-place lining 6, 400 LF of sewer, installing 2, 500…
- Nut Island HW Odor Control & HVAC - Contract 7548: Massachusetts Water Resources Authority. $29.7 million, clean water. Jan. 1, 2022. The Nut Island Headworks is a preliminary treatment facility serving 22 communities that provides screening and degritting of wastewater prior to the wastewater receiving primary and secondary treatment and…
- Littleton Sewer System Expansion: Town of Littleton. $29.4 million, clean water, $2.9 million in grants and forgiven principal. June 1, 2023. The Town of Littleton Sewer System Expansion project includes several improvements to the Town?s wastewater infrastructure. The Project includes expanding the existing collection system to service the Littleton Common…
- Nutrient Removal Upgrade and Related Facility Imp.: Springfield Water & Sewer Commission. $27.8 million, clean water. June 1, 2022. The Springfield Water and Sewer Commission?s project includes an upgrade to the Biological Nutrient Removal (BNR) Process ? Hybrid BNR Mixed Liquor Recycle Pumping, replacing the Diffused Aeration Distribution System,…
- Pumping Station Improvements (R): City of New Bedford. $26.9 million, clean water, $5.3 million in grants and forgiven principal. Dec. 1, 2023. The City of New Bedford?s pumping station upgrades are for two pumping stations: Shawmut Avenue and Howland Street. These improvements are based on the City's January 2017 Long Term CSO Control and Integrated Capital…
- Sea St. Pump Station Force Main No. 3: Town of Nantucket. $25.2 million, clean water. Nov. 1, 2021. The Sea Street Pumping Station pumps flow from the Town of Nantucket's collection system to the Surfside Wastewater Treatment Plant through one of two force mains. There is a 20-inch ductile iron force main…
Counties that received the most
- Barnstable: $473 million
- Suffolk: $381 million
- Bristol: $378 million
- Middlesex: $355 million
- Essex: $313 million
- Norfolk: $246 million
- Hampden: $220 million
- Worcester: $200 million
- Plymouth: $194 million
- Hampshire: $44.7 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.