New Mexico
Where the state’s revolving fund money for water went, project by project.
$430 million committed to 141 drinking water and clean water projects.
- Drinking water: $157 million
- Clean water: $274 million
- Grants and forgiven principal: $88.6 million
- Latest agreement: June 27, 2025
The 25 largest projects
- Los Alamos White Rock WWTP Bayo Lift Station Elimination Project: Los Alamos County. $26.2 million, clean water. Sept. 7, 2022. Construction of new White Rock WWTP and the Bayo existing lift station will be eliminated by the construction of a gravity sewer main to convey the sewerage to the Los Alamos Bayo Canyon wastewater treatment plant.
- City of Gallup Wastewater Treatment Plant Improvements: Gallup, City of. $24.0 million, clean water, $1.0 million in grants and forgiven principal. Dec. 2, 2024. WWTP Upgrade and Improvements and Sewer Improvements
- Wastewater Treatment Plant Improvements: Phase III: Farmington, City of. $22.0 million, clean water. Feb. 3, 2015. Wastewater Treatment Plant Improvements: Phase III
- Las Cruces Wastewater Improvements: Las Cruces, City of. $17.1 million, clean water, $227,000 in grants and forgiven principal. Aug. 23, 2023. Wastewater system improvements to include upgrades to the Jacob Hands Wastewater Treatment Facility and the East Mesa Reclamation along with extending the sewer collection system.
- Grants, City of: Grants, City of. $16.5 million, clean water, $630,000 in grants and forgiven principal. June 18, 2015. Planning, design, and construction of wastewater treatment facility new facilities, lift station, head works, treatment, sludge handling, aeration, disinfection, effluent disposal through a reuse system that includes…
- New Well Project: Las Cruces, City of, Las Cruces. $15.3 million, drinking water, $3.0 million in grants and forgiven principal. Sept. 13, 2024. New well and associated improvements of the well including connecting to the system and rehab of water storage tanks, including tank booster station, improvements of elevated airport water storage tank, Upper Griggs…
- Well #9 Improvements, New Well House, Arsenic Treatment: Rio Rancho, City of, Rio Rancho. $15.2 million, drinking water. May 28, 2021. Re-drill/replacement of Well #9 which was drilled in the 1980s and is failing. The facilities are over 35 years old and deteriorating. The well has seen a decrease in production due to sanding and is susceptible to…
- Upgrades to Water Treatment Plant #2: Farmington, City of, Farmington. $15.0 million, drinking water, $2.8 million in grants and forgiven principal. June 21, 2024. Upgrades, modifications, and improvements to the water treatment plant #2 and related distribution infrastructure, and improvements to water treatment plant #1, if needed.
- Treatment Plant: Farmington, City of, Farmington. $15.0 million, drinking water, $7.5 million in grants and forgiven principal. June 9, 2023. Financing the costs of upgrading and retrofitting the Governmental Unit's Water Treatment Plant and shall include such other related work and revisions necessary to complete the Project.
- Bloomfield Wastewater Treatment Plant Construction and Rehabilitation: Bloomfield, City of. $13.5 million, clean water, $4.3 million in grants and forgiven principal. Dec. 7, 2020. Wastewater Treatment Plant Construction and Rehabilitation
- ABCWUA Tijeras Reuse Reservoir and Pump Station: Albuquerque Bernalillo Co. Water Utility Authority. $10.0 million, clean water, $1.0 million in grants and forgiven principal. May 19, 2025. ABCWUA Tijeras Resuse Resrvoir and Pump Station
- Angel Fire WWTP Upgrades and Rehab including UV equipment: Angel Fire, Village of. $9.8 million, clean water, $819,000 in grants and forgiven principal. Aug. 3, 2022. Installation of new ultraviolet disinfection system and new mechanical bar screen, Upgrade and rehabilitate aging equipment to meet the facilities NPDES Permits Phase I nutrient effluent limits.
- Roswell WWTP Dewatering Facility: Roswell, City of. $9.7 million, clean water, $285,000 in grants and forgiven principal. Feb. 17, 2020. WWTP construction and rehabilitation
- Refinance of USDA Wastewater and Collection Line Debt: Socorro, City of. $9.3 million, clean water. April 23, 2025. Refinance of USDA Wastewater and Collection Line Debt
- Socorro Evergreen and Spring Street Collection System Expansion: Socorro, City of. $8.3 million, clean water, $2.5 million in grants and forgiven principal. July 5, 2023. Expand the city sewer system and remove residents from septic systems
- Tucumcari Wastewater Disposal Project Phase I: Tucumcari, City of. $8.1 million, clean water, $3.4 million in grants and forgiven principal. Jan. 29, 2020. Implement total land application of effluent and discontinue discharge to surface water.
- Los Lunas WWTPSludge Treatment and Handling Improvements: Los Lunas, Village of. $7.8 million, clean water, $405,000 in grants and forgiven principal. June 22, 2016. Plan design and construct improvements to the Village of Los Lunas wastewater treatment plant including new solids handling building and repairs to the aerobic digester.
- Los Alamos Design and Construction of White Rock Wastewater Treatment Plant: Los Alamos County. $6.2 million, clean water. April 12, 2019. Construction of new White Rock WWTP
- Water Tank Replacement: Roswell, City of, Roswell. $5.4 million, drinking water, $393,000 in grants and forgiven principal. Jan. 18, 2019. Construction of a new 2-million gallon water tank, or two, 1-million gallon water tanks.
- CRRUA WWTP Collection System Improvements: Camino Real Regional Utility Authority (CRRUA). $5.1 million, clean water. April 17, 2023. WWTP Service Area is in poor condition and in need of replacement. Replace gravity collector, lift stations, and force main which all have reach end of useful life and do not have the capacity for existing and future…
- ABCWUA Winrock Reuse ProjectPF: Albuquerque Bernalillo Co. Water Utility Authority. $5.0 million, clean water, $1.0 million in grants and forgiven principal. Oct. 3, 2024. Reuse Pipeline Extension to Winrock
- Dam Raise Study: Farmington, City of, Farmington. $5.0 million, drinking water, $1.3 million in grants and forgiven principal. June 21, 2024. Dam Raise Study for Farmington Lake as part of the 40-year water plan goals to ensure water quality and water availability. PER identified the dam could be raised 25 feet based on the topography of the surrounding…
- City of Gallup Wastewater Treatment Plant Capital Improvements: Gallup, City of. $5.0 million, clean water. Oct. 24, 2017. WWTP Improvements
- City of Aztec WWTP 2: Aztec, City of. $5.0 million, clean water. Dec. 5, 2008. Construct new WWTP to provide more capacity and to upgrade nutriet removal to meet new SWQB TMDL requirements
- Bosque Farms WWTP Upgrades: Bosque Farms, Village of. $4.9 million, clean water, $140,000 in grants and forgiven principal. Jan. 12, 2018. Village of Bosque Farms is accepting wastewater from the Town of Peralta for treatment. The Village is proposing to design, build and equip a second clarifier so that we will have the capacity to treat all of Peraltas…
Counties that received the most
- San Juan: $41.5 million
- Los Alamos: $38.1 million
- Bernalillo: $26.0 million
- Mora: $24.0 million
- Socorro: $18.6 million
- Santa Fe: $17.6 million
- Sandoval: $15.4 million
- Quay: $14.1 million
- Valencia: $13.4 million
- San Miguel: $11.8 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.