$2.2 billion committed to 228 drinking water and clean water projects.
- Drinking water: $1.1 billion
- Clean water: $1.2 billion
- Grants and forgiven principal: $92.8 million
- Latest agreement: May 28, 2025
The 25 largest projects
- Kaw Lake Intake, booster pump station, new 10 MGD water treatment plant, and waterlines: Enid Municipal Authority (IV), Enid. $205 million, drinking water. Dec. 15, 2020. Construction of Kaw Lake Intake, 68 miles of 36" and 30" raw water line with intermediate booster pump station, 10 MGD water treatment plant, water lines.
- Arcadia Lake Water Treatment Plant Expansion: Edmond Public Works Authority (IX), Edmond. $140 million, drinking water. April 28, 2022. Arcadia Lake Water Treatment Plant Expansion, Granular Activated Carbon (GAC) contactors, High Lift Pump Station (HLPS), two (2) new covered reinforced concrete clearwells, and Electrical (WTP-01B); Raw Water and…
- Chisholm Creek WWTP - ST-0183<br>;<br> Sponsorship Project - SC-1112<br>;<br> North Canadian WWTP - ST-0149<br>;<br> Lift Station #36 Improvements - SC-1099<br>;<br> WWTP Biosolids and Odor Control Management - ST-0154<br>;<br> North Canadian WWTP Disinfe: Oklahoma City Water Utilities Trust. $104 million, clean water. Sept. 27, 2022. Chisholm Creek WWTP electrical improvements, wastewater lift station No. 36 improvements, WWTP biosolids and odor control management<br><br>The Trust is sponsoring a project under the Oklahoma Conservation Commission?s…
- Chickasaw WWTF Expansion with Indirect Potable Reuse: Bartlesville Municipal Authority. $83.2 million, clean water. May 28, 2024. Bartlesville Municipal Authority currently operates a wastewater treatment plant that is aging and undersized for anticipated flows through the year 2050. The proposed project is to both rehabilitate existing…
- Atoka intake rehab, balancing tanks at Macomb & Coalgate, Hefner WTP clearwell and clarifier, etc.: Oklahoma City Water Utilities Trust (XII), Oklahoma City. $75.3 million, drinking water, $1.0 million in grants and forgiven principal. July 17, 2024. (WC-0863-2)Replacement of two balancing tanks at Macomb and Coalgate with construction of a new precast concrete balancing tank at each location with a capacity of five million gallons along with all appurtenances.…
- WWTP Rehabilitation<br>;<br> 29th St. Box Culvert and Appurtenances: Lawton Water Authority. $72.9 million, clean water. Nov. 7, 2022. Lawton Water Authority is proposing to rehabilitate or replace failing equipment including existing valves, pipes, pumps, sensors, actuators, electrical systems, and controls within the headworks, grit removal, primary…
- North Side WWTP: Shawnee Municipal Authority. $65.6 million, clean water, $1.0 million in grants and forgiven principal. Aug. 31, 2022. Northside WWTP 1) new screens, 2) new grit chamber, 3) new 5 million gallon wet weather flow equalization basin (FEB), 4) replacing the aeration systems in clarifiers and aerobic digesters, 5) renovate clarifiers, 6)…
- Oklahoma City WUT (V): Oklahoma City Water Utilities Trust (V), Oklahoma City. $57.3 million, drinking water. Nov. 29, 2016. Project (WC-0833): 6 inch and 8 inch waterline replacement. $942,130.00 Project (WT-0114): Draper Low Lift Pump Station. $19,041,588.78 Project (WT-0164): Hefner WTP Electrical Loop. $6,095,700.00 Project (WC-0757):…
- AMRs<br>;<br> Firewall Upgrade<br>;<br> Phone System Upgrades<br>;<br> Billing Systems Upgrade: Oklahoma City Water Utilities Trust. $55.0 million, clean water. June 23, 2021. The Oklahoma City Water Utilities Trust has a section of their system that need the water meters replaced as part of a city-wide effort to update all the meters. The proposed project is to replace approximately 240,278…
- Various Placeholder<br>;<br> Sponsorship Project - SC-1112<br>;<br> Deer Creek Aeration ST-0163-1<br>;<br> Deer Creek Biosolids ST-0154-1 & ST-0161<br>;<br> North Canadian Disinfection & Dechlorination ST-0167-2: Oklahoma City Water Utilities Trust. $54.8 million, clean water. Oct. 24, 2023. Holding place nothing but the $$ is correct. lc 10/29/24<br><br>The Trust is sponsoring a project under the Oklahoma Conservation Commission?s Non-Point Source Management Plan to decommission approximately 20 sewer…
- Raw water line: intake to treatment plant, finished water line from plant to Tank 02 - I35: Edmond Public Works Authority (XI), Edmond. $54.0 million, drinking water. Sept. 24, 2024. Construction of 8,200 linear feet (LF) of 42-inch and 48-inch raw water transmission pipeline with the option to use ductile iron pipe (DIP), high density polyethylene pipe (HDPE) or steel pipe; and 22,700 LF of…
- New WWTP: Newcastle Public Works Authority. $51.8 million, clean water. Aug. 22, 2023. The proposed project is to construct a new WWTF at an adjacent site and abandon the existing facility. Forcemains will be constructed to transmit wastewater to the new site and from the new site to the new discharge…
- WWTP Rehabilitation: Lawton Water Authority. $47.0 million, clean water. June 29, 2021. Lawton Water Authority is proposing to rehabilitate or replace failing equipment including existing valves, pipes, pumps, sensors, actuators, electrical systems, and controls within the headworks, grit removal, primary…
- Lake Arcadia Intake Project: Edmond Public Works Authority (VII), Edmond. $45.0 million, drinking water, $1.0 million in grants and forgiven principal. April 28, 2022. Construction of new intake structure on Lake Arcadia.
- Lake Ellsworth<br>;<br> Lake Lawtonka<br>;<br> Lake Gondola: Lawton Water Authority. $39.0 million, clean water. April 4, 2025. Currently, Lake Ellsworth Dam has an overall condition rating of unsatisfactory. This rating is primarily due to the condition of spillway gates, panels, guide walls, and drainage system. Condition assessment of the…
- Water Treatment Plant Upgrades: Stillwater Utilities Authority (V), Stillwater. $37.0 million, drinking water, $1.0 million in grants and forgiven principal. Dec. 19, 2023. Construction of the WTP Finished Water Pump Station, and Recovered Water Pump Station.
- New SBR WWTP: Glenpool Utility Services Authority. $35.0 million, clean water. Dec. 20, 2024. Glenpool USA is needing additional funding for their current ARPA grant project for wastewater treatment plant improvements. The project is the construction of a new Sequencing Batch Reactor (SBR) Wastewater Treatment…
- Waterline and Distribution Line replacement: McAlester Public Works Authority, Mcalester. $32.5 million, drinking water, $1.1 million in grants and forgiven principal. Dec. 21, 2021. Project consists of citywide waterline replacement, and the rehabilitation of four existing tanks over the next several years.
- Tank Rehabilitation: Oklahoma City Water Utilities Trust (X), Oklahoma City. $31.6 million, drinking water, $1.1 million in grants and forgiven principal. April 26, 2022. (WC-0991) Hefner Rehabilitation of the MacArthur Elevated Water Storage Tank (WT-0151) Hefner Water Treatment Plan Ozone System Improvements (WC-1022) 18-inch Waterline Aerial Crossing at NW 10th Street and North…
- Norman Utilities Authority (II): Norman Utilities Authority (II), Norman. $31.0 million, drinking water. Jan. 31, 2017. Improvements to the 17-million gallon per day Norman Water Treatment Plant by the addition of intermediate pump station, addition of new ozone system (ozone generators, ozone contractors, dissolution system, and…
- Chisholm Creek Sewer Rehab: Edmond Public Works Authority. $30.0 million, clean water. Sept. 24, 2024. The Authority owns and operates a sewer system with aging sewer mains and manholes, including aging creek crossings. Two projects are proposed to address portions of the system. The Chisholm Creek project will replace…
- Water Line Replacement: Lawton Water Authority (III) and (VI), Lawton. $30.0 million, drinking water. Dec. 7, 2023. Construction of approximately 23 miles of city-wide water line replacement of various sizes ranging from eight (8) to twelve (12) inches and all related appurtenances
- Sewer System Rehabilition: Lawton Water Authority. $30.0 million, clean water. Oct. 5, 2023. Lawton Water Authority is performing a multi-phase city-wide sewer rehabilitation to reduce sanitary sewer overflows and backups. The proposed project is to replace 125 miles of line, beginning with 32,791 lf of…
- Dam Rehab and I/I Construction: Ardmore Public Works Authority. $30.0 million, clean water. Dec. 30, 2021. Ardmore Public Works Authority (Authority) has two dams at City Lake and Mountain Lake that each supply a portion of the City?s water supply. After an engineering survey there were found several issues in each of the…
- Water Line replacement: Lawton Water Authority (VII), Lawton. $29.0 million, drinking water. Aug. 23, 2024. Construction of approximately 130,000 feet of city-wide water line replacement of various sizes ranging from eight (8) to twelve (12) inches and all related appurtenances.
Counties that received the most
- Oklahoma: $627 million
- Comanche: $264 million
- Garfield: $216 million
- Pottawatomie: $96.3 million
- Washington: $93.5 million
- Tulsa: $52.2 million
- McClain: $51.8 million
- Wagoner: $41.7 million
- Cleveland: $40.6 million
- Payne: $37.0 million