Puerto Rico
Where the state’s revolving fund money for water went, project by project.
$643 million committed to 120 drinking water and clean water projects.
- Drinking water: $150 million
- Clean water: $493 million
- Grants and forgiven principal: $344 million
- Latest agreement: April 30, 2025
The 25 largest projects
- Ponce Nueva WTP: Puerto Rico Aqueduct and Sewer Authority, Ponce. $62.0 million, drinking water, $7.5 million in grants and forgiven principal. June 12, 2023. The Puerto Rico Aqueduct and Sewer Authority (PRASA) proposes to improve the Ponce Nueva Water Treatment Plant (WTP) in the municipality of Ponce, Puerto Rico to comply with the stipulations set forth in the Department…
- Ponce Nueva WTP: Puerto Rico Aqueduct and Sewer Authority, Ponce. $46.3 million, drinking water, $24.1 million in grants and forgiven principal. Aug. 30, 2021. The Puerto Rico Aqueduct and Sewer Authority (PRASA) proposes to improve the Ponce Nueva Water Treatment Plant (WTP) in the municipality of Ponce, Puerto Rico to comply with the stipulations set forth in the Department…
- Rehabilitation of Sanitary Sewer System (SSOMP) Metro Region: PRASA. $45.0 million, clean water, $45.0 million in grants and forgiven principal. April 11, 2025. The Puerto Rico Aqueduct and Sewer Authority (PRASA) proposes a project as a part of the Sewer System Operation and Maintenance Program (SSOMP) that identifies several sanitary sewer segments with internal damage…
- Rehabilitation of Wastewater Pump Stations North Region: PRASA. $20.0 million, clean water, $20.0 million in grants and forgiven principal. April 11, 2025. The project includes the replacement of valves, MCC, electrical and control panels, well sealing, installation or replacement of valves, well and roof sealing, installation of an emergency generator and structural and…
- Rehabilitation of Wastewater Pump Stations West Region: PRASA. $20.0 million, clean water, $20.0 million in grants and forgiven principal. April 11, 2025. The project includes the replacement of valves, MCC, electrical and control panels, well sealing, installation or replacement of valves, well and roof sealing, installation of an emergency generator and structural and…
- Rehabilitation of Wastewater Pump Stations South Region: PRASA. $20.0 million, clean water, $20.0 million in grants and forgiven principal. April 11, 2025. The project includes the replacement of valves, MCC, electrical and control panels, well sealing, installation or replacement of valves, well and roof sealing, installation of an emergency generator and structural and…
- Rehabilitation of Wastewater Pump Stations East Region: PRASA. $20.0 million, clean water, $20.0 million in grants and forgiven principal. April 11, 2025. The project includes the replacement of valves, MCC, electrical and control panels, well sealing, installation or replacement of valves, well and roof sealing, installation of an emergency generator and structural and…
- Rehabilitation of Wastewater Pump Stations Metro Region: PRASA. $20.0 million, clean water, $20.0 million in grants and forgiven principal. April 11, 2025. The project includes the replacement of valves, MCC, electrical and control panels, well sealing, installation or replacement of valves, well and roof sealing, installation of an emergency generator and structural and…
- C-72-108-10: SALINAS - GUAYAMA TRUNK SEWER REHABILITATION: PRASA. $19.5 million, clean water. Aug. 18, 2020. This trunk sewer conveys raw sewage to the Troncal Salinas Wastewater Pump Station, which conveys this flow to the Puente Jobos Wastewater Pump Station and then to the Guayama Regional WWTP for treatmetn.…
- Ponce en Marcha IVB<br>;<br> Vieques Naguabo WDS Improvements<br>;<br> Bo Rio Ca?as WDS Improvement: Puerto Rico Aqueduct and Sewer Authority, San Lorenzo. $17.6 million, drinking water, $8.8 million in grants and forgiven principal. Oct. 4, 2024. The Puerto Rico Aqueduct and Sewer Authority (PRASA) proposes the installation of new potable water pipelines and new sanitary sewer pipelines along Hostos Avenue and Municipal Streets of the Ponce Playa Sector. The…
- C-72-051-01: IMPROVEMENTS FOR ODOR CONTROL AND ADDITIONAL IMPROVEMENTS TO THE DORADO WWTP: PRASA. $17.4 million, clean water. Aug. 18, 2020. DESIGN AND BUILD FOR IMPROVEMENTS TO THE DORADO WWTP TO CONTROL ODORS AND REPLACEMENT OF A LATERAL SEWER SEGMENT LOCATED AT STATE ROAD PR-696. (NC)
- Infiltration and Flow Improvements ? Dorado: PRASA. $14.0 million, clean water, $14.0 million in grants and forgiven principal. April 11, 2025. The project contemplates carrying out a study in the aforementioned municipality to identify and quantify the amount of inflow that enters the sanitary sewage system, identify the reason and the repair method, whether…
- C-72-108-08: PATILLAS-ARROYO-GUAYAMA TRUNK SEWER: PRASA. $13.9 million, clean water. Aug. 18, 2020. The project consists of the construction of a trunk sewer and a force main that allows for the elimination of the Patillas Wastewater Treatment Plant and will convey the wastewater to the Guayama Regional Wastewater…
- Stormwater Improvements at Navarro Community ? Gurabo: MUNICIPALITY OF GURABO. $13.2 million, clean water, $13.2 million in grants and forgiven principal. Nov. 22, 2024. The Navarro Community does not have appropriate sidewalks for walking, it does not have adequate lighting for its own use, and rainwater runs through inadequate systems that causes overflows. The project includes the…
- Coto Laurel WTP<br>;<br> Ponce Vieja WTP<br>;<br> Cerro Gordo RWI<br>;<br> Cerro Gordo WTP<br>;<br>: Puerto Rico Aqueduct and Sewer Authority, Ponce. $12.3 million, drinking water, $3.4 million in grants and forgiven principal. Oct. 11, 2024. The Puerto Rico Aqueduct and Sewer Authority (PRASA) proposes to improve the Coto Laurel WTP in the municipality of Ponce, Puerto Rico. The project improvements include: 1. Installation of new equipment. 2.…
- Ponce Nueva WTP: Puerto Rico Aqueduct and Sewer Authority, Ponce. $11.9 million, drinking water, $6.3 million in grants and forgiven principal. Sept. 2, 2022. The Puerto Rico Aqueduct and Sewer Authority (PRASA) proposes to improve the Ponce Nueva Water Treatment Plant (WTP) in the municipality of POnce, Puerto Rico to comply with the stipulations set forth in the Department…
- HEVIA COMMUNITY SANITARY SEWER SYSTEM: MUNICIPALITY OF NARANJITO. $11.4 million, clean water, $11.4 million in grants and forgiven principal. Jan. 19, 2024. PLANNING AND DESIGN OF A SANITARY SEWER SYSTEM FOR THE HEVIA COMMUNITY AND SURROUNDING COMMUNITIES.
- C-72-096-05: GUAYAMA WWTP IMPROVEMENTS - GUAYAMA, PR: PRASA. $11.3 million, clean water. Aug. 18, 2020. The project consists of making improvements to the Guayama WWTP process units. Among the improvements considered are: 1) Rehabilitation and repair of control system in inlet pumps and septic tanks, 2) Rehabilitation…
- C-72-093-22: PE?UELAS WWTP ELIMINATION: PRASA. $11.2 million, clean water. Aug. 18, 2020. PRASA owns and operates the Pe?uelas Wastewater Treatment Plant (WWTP), located in Pe?uelas, Puerto Rico, which is part of the PRASA South region infrastructure. The plant is a Minor Discharge municipal WWTP (Permit…
- Infiltration and Flow Improvements ? Cidra: PRASA. $10.0 million, clean water, $10.0 million in grants and forgiven principal. April 11, 2025. The project contemplates carrying out a study in the aformentioned municipality to identify and quantify the amount of inflow that enters the sanitary sewage system, identify the reason and the repair method, whether…
- C-72-096-46: PUERTO NUEVO WWTP DEGRITTERS: PRASA. $9.2 million, clean water. Aug. 18, 2020. The existing grit removal facility at the Puerto Nuevo RWWTP has not been operational since 2009. The absence of a functioning grit removal facility results in excessive levels of grit within the clarifiers and…
- C-72-082-11: AGUAS BUENAS-CAGUAS III TRUNK SEWER: PRASA. $8.4 million, clean water. Aug. 18, 2020. The project consists of the construction of a trunk sewer that allows for the elimination of the Aguas Buenas Wastewater Treatment Plant, Las Carolinas Wastewater Treatment Plant and several pump stations.
- C-72-115-01: ARROYO MAIN PUMP STATION IMPROVEMENTS - ARROYO: PRASA. $8.0 million, clean water. Aug. 18, 2020. This pump is part of the sanitary sewer system that serves the service area of Guayama. This service area includes parts of the Municipalities of Guayama, Arroyo, Patillas and Salinas. Currently this facility has four…
- Emergency Generators ? Wastewater South Region: PRASA. $7.0 million, clean water, $7.0 million in grants and forgiven principal. April 11, 2025. Acquisition and installation of Emergency Generators. The objective of this project is to replace power emergency generators that are out of service, defective or have reached their useful live. Project includes the…
- Emergency Generators ? Wastewater North Region: PRASA. $7.0 million, clean water, $7.0 million in grants and forgiven principal. April 11, 2025. Acquisition and installation of Emergency Generators. The objective of this project is to replace power emergency generators that are out of service, defective or have reached their useful live. Project includes the…
Counties that received the most
- San Lorenzo Municipio: $17.6 million
- Ponce Municipio: $12.3 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.
All states · About the data · New Hampshire concept · Consul, Inc.