South Carolina
Where the state’s revolving fund money for water went, project by project.
$587 million committed to 168 drinking water and clean water projects.
- Drinking water: $223 million
- Clean water: $364 million
- Grants and forgiven principal: $62.8 million
- Latest agreement: June 27, 2025
The 25 largest projects
- Adkins 60-Inch Potable Water Transmission Main - Phase I: City of Greenville, Greenville. $30.0 million, drinking water. Feb. 23, 2024. Construct approximately 63,131 linear feet (LF) of 60-inch water line, 67 LF of 36-inch water line, 4 LF of 24-inch water line, 504 LF of 20-inch water line, 8 LF of 12-inch water line, 913 LF of 6-inch water line and…
- Manchester Creek Wastewater Treatment Plant Biosolids Processing Facility: City of Rock Hill. $28.4 million, clean water. April 24, 2025. The Biosolids Processing Facility Project includes new waste activated sludge pumping and storage, a new Dewatering Facility (including 3 belt filter presses and all ancillary equipment), a new Thermal Dryer Facility…
- Shaw's Creek Water Treatment Plant: City of Aiken, Aiken. $27.0 million, drinking water. June 28, 2024. The construction of a new 8.0 million gallon per day surface water treatment plant and raw water pumping station. The project includes dam improvements at the intake, new raw water pumping station, vertical…
- Bull Creek Surface Water Treatment Plant Expansion: Grand Strand Water and Sewer Authority, Conway. $24.6 million, drinking water. April 26, 2024. Expansion of existing Bull Creek Surface Water Treatment Plant from 45 MGD to 60 MGD. Expansion includes modification to existing raw water pump station, raw water transmission main, rate of flow controllers, and…
- Lower Berkeley Wastewater Treatment Plant Expansion: Berkeley County. $17.5 million, clean water. Dec. 17, 2020. Improvements to aeration system for 2.8-million-gallon aeration basins. Installation of four blowers, fine bubble diffused aeration membranes, air piping, electrical upgrades including a new generator, and…
- Swamp Rabbit Trunk Gravity Upgrades - Phase I A: Renewable Water Resources. $15.4 million, clean water. June 27, 2025. This project includes the construction of approximately 2,820 linear feet (LF) of 60-inch and 28 LF of 48- inch ductile iron pipe (DIP) gravity trunk sewer; 277 LF of 48-inch, 30 LF of I 0-inch and 36 LF of 16- inch…
- Myrtle Beach WWTP Influent Pump Station and Headworks: Grand Strand Water and Sewer Authority. $14.4 million, clean water. Sept. 30, 2022. The project includes the construction of a new influent pump station located at the Myrtle Beach WWTP. The new pump station will transfer influent flow to a new headworks which includes fine screen and grit removal…
- Wastewater Treatment Plant Improvements - Biosolids: Town of Summerville. $13.6 million, clean water. March 28, 2023. Upgrades to the existing three (3) digesters. Construction of three (3) solar dryers with each dryer being approximately fifty-two (52) feet by three hundred and seventy-two feet, including loading aprons and a new…
- Central Berkeley Wastewater Treatment Plant Effluent Force Main and Pump Station: Berkeley County. $13.5 million, clean water. Aug. 11, 2022. Upgrade of existing Central Berkeley Wastewater Treatment Plant Effluent Pump Station with four new 125 horsepower vertical turbine pumps, variable pump drives, piping, etc. and construction of 17,500 linear feet of…
- Residuals and Water Treatment Plant Improvements: City of Orangeburg, Orangeburg. $13.1 million, drinking water. May 22, 2025. New bulk lime storage tank, new backwash pump station to increase firm capacity, new piping to divert sedimentation basin sludge and route to new plant drain, new 18-inch plant drain discharging to existing sanitary…
- Water Supply to Batesburg-Leesville: Joint Municipal Water and Sewer Commission, Lexington. $12.5 million, drinking water. March 1, 2024. Installation of approximately 40,000 linear feet of water main, a booster pump station, an elevated tank, 23 fire hydrants and necessary appurtenances and connections.
- Wastewater Treatment Plant Effluent Storage and Pumping Improvements: Seabrook Island Utility Commission. $12.1 million, clean water. June 28, 2024. Improvements/modifications to the existing Wastewater Treatment Plant Effluent Holding Pond to increase dike height by five (5) feet and install new Intermediate and Effluent Pump Station.
- Sand River Basin Sewer Rehabilitation: City of Aiken. $11.2 million, clean water. Nov. 15, 2017. Rehabilitation of 49 miles of sewer pipe using the test and seal grouting method to seal defective joints, cracks, fracture and moderated joint offsets.
- Cane Bay Water Tower and Main Extension: Berkeley County, Moncks Corner. $11.0 million, drinking water. Feb. 28, 2025. Installation of a one-million-gallon elevated water storage tank, demolition of existing storage tank, water main extensions, meter station, and necessary appurtenances and connections. Horizontal directional drilling…
- Pump Station 00 l Force Main Replacement - Phase III: Berkeley County. $10.9 million, clean water. Aug. 11, 2022. Replacement of approximately 6,580 linear feet of 30-inch ductile iron pipe force main with new 42-inch polyvinyl chloride force main to include all appurtenances to the end of the Phase I replacement (outside of…
- Brushy and Welcome Creeks Gravity Sewer Upgrades Phase 1: Renewable Water Resources. $10.8 million, clean water. Sept. 30, 2024. The project includes the construction of approximately 8,100 linear feet of fiberglass reinforced polymer gravity sewer: 5,124 linear feet of 24-inch, 1,478 linear feet of 30-inch, 1,005 linear feet of 36-inch, and 491…
- Lower Reedy Water Resource Recovery Facility Digester Improvements - Phase 2: Renewable Water Resources. $10.8 million, clean water. June 9, 2023. Rehabilitation of the existing Digester Number 1 to include installation of a new fixed steel cover and a linear motion mixing system. Rehabilitation of the existing control building with a new heat exchanger and…
- Water Treatment Plant Alum Sludge Dewatering Facility: City of Rock Hill, Rock Hill. $10.6 million, drinking water. June 20, 2024. Includes new alum sludge dewatering facility with two centrifuges, site work piping and other miscellaneous facility improvements and rehabilitation.
- Highway 17 and Rifle Range Road Force Main Replacement/Improvements: Mt. Pleasant Waterworks and Sewer Commission. $10.2 million, clean water. March 15, 2024. Project includes: (a) a trenchless installation of approximately 6,420 linear feet (LF) of new 20-inch force main, predominately with the use of horizontal directional drilling, to replace a deficient 12-inch existing…
- Unity Park Trunk Sewer Improvements: Renewable Water Resources. $9.8 million, clean water. May 19, 2020. Construction to include the replacement of an existing 20-inch sewer with approximately 2,000 feet of a new 42-inch gravity sewer, an existing 18-inch sewer with approximately 2,100 feet of a new 30-inch gravity sewer,…
- Red Bank Road Gravity Line Replacement: Berkeley County. $9.7 million, clean water. Aug. 11, 2022. Installation of approximately 88 linear feet (LF) of 36-inch polyvinyl (PVC) gravity sewer pipe, 4,418 LF of 42-inch high density polyethylene (HOPE) gravity sewer pipe, 632 LF of 30-inch PVC sewer force main, and 130…
- Pump Station 106 Impvt: Berkeley County. $9.1 million, clean water. Sept. 30, 2021. Pump Station 106 Improvement. Construct new Pump Station to replace
- Hemphill Water Treatment Facility Improvements - Phase 1: Chester Metropolitan District, Chester. $9.0 million, drinking water. June 28, 2024. Rehabilitation of raw water pump station, rapid mix, flocculation, and sedimentation basins including structural repairs and equipment replacement, filter media replacement, surge vessel installation, SCADA…
- Conway to Bucksport Wastewater Treatment Plant Flow Diversion: Grand Strand Water and Sewer Authority. $8.5 million, clean water. March 29, 2024. The project includes the construction of a new booster pump station at the Conway Wastewater Treatment Plant and approximately 40,078 linear feet of 20-inch C900 polyvinyl chloride force main and all appurtenances.
- Lower Reedy Water Resource Recovery Facility Odor Control Improvements: Renewable Water Resources. $8.2 million, clean water. June 9, 2023. Construction of new odor control facilities including the addition of aluminum covers on three existing processing tanks, two biotrickling filter systems and associated necessary for a complete odor control system.
Counties that received the most
- Greenville: $93.8 million
- Berkeley: $84.3 million
- Aiken: $49.1 million
- Horry: $45.8 million
- York: $39.0 million
- Lexington: $32.0 million
- Richland: $20.5 million
- Anderson: $17.8 million
- Charleston: $15.2 million
- Dorchester: $14.6 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.