Utah
Where the state’s revolving fund money for water went, project by project.
$361 million committed to 147 drinking water and clean water projects.
- Drinking water: $217 million
- Clean water: $144 million
- Grants and forgiven principal: $90.0 million
- Latest agreement: June 26, 2025
The 25 largest projects
- Provo City: Provo City. $92.8 million, clean water, $7.0 million in grants and forgiven principal. Oct. 14, 2020. Provo City is proposing to construct a new treatment plant, replacing its existing works. The project will include Administration/Operations building, Influent pumping, Screening and grit removal, Primary treatment…
- New Project: Ogden City, Brigham City. $34.4 million, drinking water. Oct. 15, 2024. Scope: replace transmission lines (approx 31,500 ft 36?, 2,300 ft 42?, 3,800 ft 42? gravity main)
- Kearns Improvment District Portfolio Financing: Kearns Improvement District, Kearns. $19.7 million, drinking water. Dec. 17, 2019. Various projects including a 2MG Tank, Two Booster Pump Stations, 5MG Tank, Pump Station Upgrades, 12" Waterline, 1.5MG tank and related waterline, Pump Stations, 30" Waterline, Upsizing existing transmission mainlines…
- New Project: Payson City. $14.5 million, clean water, $1.0 million in grants and forgiven principal. May 5, 2022. Payson City proposes to construct a 5 mgd oxidation ditch as a treatment facility upgrade. The proposed project includes: site work, plant repairs, headworks improvements and expansion, new primary lift station, new…
- Ridgeland Booster Pump Station: Granger Hunter Improvement District, Salt Lake City. $13.8 million, drinking water, $2.8 million in grants and forgiven principal. May 9, 2023. Replacement of Ridgeland Booster Pump Station and cast iron water lines, all of which have reached the end of their useful lives.
- Millville City Collection System: Millville City. $9.7 million, clean water, $4.5 million in grants and forgiven principal. Jan. 12, 2021. The proposed project consists of two principal parts: (1) constructing 15.6 miles of new sewerage system that will provide sewer service throughout the community; (2) connecting the new sewerage system to a regional…
- Design advance: Holden, Holden. $8.7 million, drinking water, $3.5 million in grants and forgiven principal. Feb. 23, 2023. DESIGN FOR a new well, transmission line, new 500,000 gallon tank, redundant tank distribution line, meter upgrades and upgrades to the chlorination
- New Project: Provo City, Provo. $8.0 million, drinking water. Feb. 18, 2025. Scope: Design for the replacement of intake structure on dam (including new control valves). Its continuous operation is critical to maintaining water supply to most cities in Salt Lake and North Utah Counties.
- Design & construct new well & replace piping: Leeds Domestic Waterusers Assn, Leeds. $7.8 million, drinking water, $3.5 million in grants and forgiven principal. May 17, 2023. Design and Construction of a new well to serve as a redundant source of water to the system. Install an altitude control valve and vault to control overflow water from the system being run to waste; but rather, divert…
- Mountain Green Lagoon Upgrade: Mountain Green Sewer Improvement District. $7.0 million, clean water. April 28, 2022. Based on their alternatives analysis, Sunrise Engineering, Inc. recommended upgrading the existing lagoon treatment plant facility with BNR technology. This alternative will allow them to achieve phosphorus reductions…
- Design and Construct tank, replace transmission: Wallsburg Town, Wallsburg. $6.9 million, drinking water, $3.5 million in grants and forgiven principal. April 18, 2024. New 500k-gal tank, waterline replacement, hydrants, PRV station
- Design Advance<br>;<br> Construct new tank; replace distribution: Spring City, Spring City. $6.2 million, drinking water, $1.9 million in grants and forgiven principal. June 12, 2023. Design Installation and replacement of multiple distribution lines, new 500,000 gallon tank, and SCADA<br><br>Installation and replacement of multiple distribution lines, new 500,000 gallon tank, and SCADA
- SSL part of CVWRF Series 2020A Project 260A (30B BNR Basins/PEPS/RAS Selector): South Salt Lake City. $6.2 million, clean water, $3.8 million in grants and forgiven principal. June 11, 2020. The Project consists of constructing a nominal 21.7 million gallon concrete aeration basin divided into 4 trains. Each train will have two cut throat flumes, 4 mixers, 2 intermediate mixed liquor recycle (IMLR) pumps,…
- New Project: Green River City, Green River. $5.6 million, drinking water, $3.5 million in grants and forgiven principal. Dec. 18, 2024. Scope: repair and recoat the steel tank interior and exterior; upgrade and/or refurbish the water treatment plant, finished water clear well, PRV station, portions of the SCADA system. Replace 1,150 linear feet of…
- New Project: Brian Head Town, Parowan. $5.5 million, drinking water, $1.6 million in grants and forgiven principal. Nov. 14, 2024.
- Millville City Collection System: Millville City. $5.0 million, clean water, $3.8 million in grants and forgiven principal. April 10, 2024. The proposed project consists of two principal parts: (1) constructing 15.6 miles of new sewerage system that will provide sewer service throughout the community; (2) connecting the new sewerage system to a regional…
- Wolf Creek construction of a reuse storage pond and distribution pipeline and pump station: Wolf Creek SID. $5.0 million, clean water. June 26, 2025. Wolf Creek is constructing a new 45 acre-ft reuse storage pond for storage of treated effluent from heir MBR plant, as well as construct a new pump station and pipeline to the golf course. At buildout in 2032, Wolf…
- Hyde Park: Hyde Park, Franklin. $5.0 million, drinking water. April 15, 2021. 2 MG storage tank, 10,000 feet of 12" transmission line, 7,000 feet of 16" distribution line, 2,900 feet of 6" dedicated pumping line and 2 booster pump stations.
- New Project: Green Hills Country Estates, Huntsville. $4.0 million, drinking water, $2.8 million in grants and forgiven principal. Sept. 10, 2024. Scope: new pump house & piping, multimedia filtration, side stream reverse osmosis, and upgrade SCADA system.
- Distribution Upgrades: High Valley Water Co., Park City. $4.0 million, drinking water, $2.0 million in grants and forgiven principal. June 6, 2023. This project will replace approximately 20,000 LF of distribution line, install 2 PRV stations, install new service connections with meter assemblies, add approximately 50 new valves and 24 new fire hydrants
- New Project: Magna Water District, Magna. $4.0 million, drinking water, $3.2 million in grants and forgiven principal. Feb. 27, 2025. Lead Remediation Project
- New Project: Hanna Water & Sewer District, Tabiona. $3.8 million, drinking water, $2.9 million in grants and forgiven principal. Dec. 23, 2024. Scope: Design & construct booster pump station, 4,500 ft of 12 in dist line, river crossing, 10,100 ft of 8 in distrib line
- New Well and Well House Project: Moroni City, Morni. $3.5 million, drinking water, $1.1 million in grants and forgiven principal. Feb. 1, 2022. Moroni City is requesting financial assistance to construct a new well and well house, a 500k gallon storage tank and overflow line, PRV station and pumplines, and make several improvements to the existing SCADA and…
- New Project: Big Plains Water & Sewer SSD, Apple Valley. $3.4 million, drinking water, $3.4 million in grants and forgiven principal. Sept. 19, 2024. Emergency project to connect Apple Valley and Cedar Point systems to resolve capacity issue at Cedar Point
- Woodland Hills City: Woodland Hills, Woodland Hills. $3.3 million, drinking water, $341,000 in grants and forgiven principal. Oct. 13, 2020. Woodland Hills City has a project consisting of 17,000 LF of new 8-inch PVC C-900 to replace an aging and failing existing 6-inch ductile pipeline within existing city streets. This includes replacing valves, fire…
Counties that received the most
- Utah: $125 million
- Weber: $43.6 million
- Salt Lake: $40.7 million
- Cache: $21.3 million
- Sanpete: $15.1 million
- Wasatch: $13.9 million
- Washington: $12.4 million
- Iron: $10.7 million
- Summit: $10.2 million
- Millard: $8.9 million
Every project, with filters, a map and a table, is on this page in the app. Source: EPA State Revolving Fund public records, through June 30, 2025.